top of page

CLASS 10A CARPORT/PATIO/SHED

Class 10a structures: smooth certification over multiple projects.

In the industry?

Your next projects delivered safe and compliant, ready for Queenslanders to enjoy

Website 10a approvals process image_02_edited.jpg
shed image.png

Service Options – new Class 10a structures

​​

Send plans for a quote or contact us

Drag and drop documents direct: online form (engage BA&A and we’ll begin and send the invoice)

Save time

Streamlined approvals

Innovative technology

Over ten years experience with Class 10a projects

Rapid engagement: quick online form

Access your personalised portal dashboard ->check project status, mange documentation whenever suits your team.

Client questions answered quicker

So you don’t have to wait, its easy to get in touch with our small and friendly team. We get to know you (and your projects!) and tailor service options accordingly.

 

You can expect

Support to quote your next project accurately –help ownersunderstand  additional applications like boundary relaxation / siting variation. Quick clarificationof site specific requirements and QDC MP 1.2 insights are just a call or email away.

Speedy advice from our dedicated 10a team means you can find the best design solution even when services are within 3m of new work or a Build Over Asset (BOA) is triggered.

A guide on site specific requirements and expert insights to navigate town planning overlays–itseasy to obtain sanity checks from consistent points of contact at BA&A.

  1. Install dates met – approvals issued fast
    - Because council approval is commonly triggered for Class 10a building work, your design and sales consultants need quick answers.
    - For standard to challenging projects, BA&A can help overcome any challenges early.

  2. Build safe and keep your clients happy
    Approvals are valid for 12 months (ask if longer is required, we can tailor to suit)

  3. Legislative obligations met = peace of mind
    At finalisation stage, streamlined systems support owners. So your Form 21 is in hand ASAP, and you can get on with winning next jobs.

 

 

Scheduling and FAQs

Need your Class 10a  projects delivered on time, safe and compliant? 

 

  • Check out our tips and timesavers for patio, shed and carport approvals in Brisbane and surrounds.

  • Understand timeframes with this guide.

  • Arrange fuss-free final inspections.

Simplify the complex

 

  • Clarifying setbacks

  • Property easements / covenant requirements

  • Queensland Development Codes

  • National Construction Code

  • Building code fire separation requirements when less than 900mm from property boundary

  • Termite protection / roof water discharge

  • Triggers: Exceptions and exemptions

Website 10a approvals process image_02_edited.jpg

Knowledgeable and experienced

​Shed builders, patio suppliers and outdoor living space designers – get started here.

downpipes connect.png
  • Residential building approvals/ certification for contractors/ suppliers (patio, shed, carport, pergola)

  • Deck and roofed decks - Class 10a domestic building approvals: certification for builders and deck specialists

​For multiple projects, ask for access to the client portal. Its simple to arrange and means that your team can track and organise your 10a work, as suits you.

DeckBoys roofed.jpg

Construction by @rd_deckboys, engineered by @ngsengineers

steve brooks gb carport.jpg

Construction by Steve Brooks, plans by GB Design

Carport_SEQ .jpg

c/o SEQ Patio Group

PROFESSIONALS WE WORK WITH

logo BTP.png

WHAT OUR CLIENTS SAY

Please pass on my thanks to Branden for doing the inspection, and for his phone advice and information prior to inspecting the patio cover - all much appreciated.

Terms you need to know

1.

RFI: The Request for Information is a list of requirements. This document outlines all items required by the certifier to issue an approval.

2.

Build Over Sewer (BOS): an approval from Council is required  to build over or near a sewer line. During assessment, BA&A can determine if a BOS permit is required. 

3.

Build Over Stormwater (BOSW): an approval from Council is required to build over or near stormwater infrastructure.

4.

Relaxation (or Siting Variation): a relaxation approval from Council may be required if you are building within the boundary setbacks of your property. There are different setback requirements for lots under 450m2 and lots over 450m2

6.

Form 15: this is a certificate required before the building works can commence to certify that the design is compliant with the relevant regulations.

7.

Form 16: this is a certificate required at the completion of building works to certify that the installation or inspection of a stage or aspect is compliant with the relevant regulations.

 

8.

Form 21: once all required documentation is received, this is the final certificate issued by the certifier. Finalises the building application.

 

Checklist: 10a structures

Speed your approvals: include these details

Infrastructure: detail location of sewer, stormwater, water mains including connection points/ manholes etc. Search tool/ links here

Site Plan​​
Elevation Plan

Road boundary

Total height of structure from Natural Ground Level (NGL)

Height of wall

Setback distances to Outermost Projection (OMP-eaves), wall, 

existing buildings on site.

Road boundarySite cover and area

Orientation or north point

Take the info with you

​Builders/ contractors: ensure your 10a projects comply.

 

Resources below to help you keep your team informed of the shed/ carport/ patio/ deck certification process.

​Contact us for a printed version. 

BA&A_brochures download_website-10a timeframes.jpg
BA&A_brochures download_website-10a plan requirements.jpg
BA&A_brochures download_website-10a industry professionals .jpg
BA&A_brochures download_thmbnail for 5 tips 10a.jpg
IN THE INDUSTRY? 

Get in touch. The BA&A team looks forward to helping.

Subscribe for certification updates. Stay in the loop for approval timesavers, industry updates, and CPD.

Thanks for submitting!

© 2025 by Building Approvals & Advice

bottom of page